Duplicate, move to another project or delete a work package
Tip
In OpenProject 14.5 the term Copy a work package was replaced by Duplicate a work package.
Change project was replaced by Move to another project.
If you right-click in a work package table, editing options will be displayed. Here, you can move a work package to another project, duplicate a work package, or copy its URL to the clipboard, delete it or duplicate it in another project.
You can also access these features by using the three dots at the far right of a row to access the menu.
Alternatively, open the work packages details view by double clicking the respective row, click on More functions (the three dots at the top right of the work package details) and select the respective menu item.
To duplicate, move or delete multiple work packages at once please refer to the documentation for bulk edit.
Duplicate a work package
When duplicating (or copying) a work package, a work package form with the pre-set values of the original work package is shown.
Copying a work package allows to easily create and adjust new work packages based on existing one’s.
Copy link to clipboard
This option copies a short link to the work package to your clipboard so you can quickly paste it elsewhere. It can also be useful when you want to quickly copy links to multiple work packages without having to open the detailed view of each one.
Move a work package to a different project
The Move to another project option moves a work package to another project or subproject. Select the project into which the work package is to be moved, check whether further adjustments are necessary and confirm by clicking on Move.
Note
You can only move a work package into projects that you are a member of and for which you are authorized to carry out this function.
Tip
If the current work package type does not exist in the target project, you will see a warning message asking you to either activate a desired work package type or select one of the activated ones. Read more on activating a work package type for a specific project or creating new work package types in OpenProject administration.
Tip
If the work package you are moving has children work packages, they will be moved as well.
Delete a work package
The right to delete work packages is tied to specified roles (for example system administrators). The roles and permission may vary from project to project.
You can select these options either in the detail view under More or via the context menu by right-clicking into the work package table. The latter option allows you to perform an action (such as copying, moving or deleting a work package) on multiple work packages at once.